Information about Axpo AG’s own hydropower stations, stakes in partner hydropower stations and Axpo AG’s hydropower upgrade projects is available here.
Refurbishment of Linth-Limmern
One of the more significant upgrade projects is "Linthal 2015". A new underground pumped storage facility will be used to pump water from Lake Limmern back up to Lake Mutt.
The plant, which was converted around 1930, exploits the downward flow of the River Aare over a distance of 7.4 km and stands at the end of an artificial headrace. The Aare island which this creates is currently the site of the Beznau nuclear power plant.
The plant, which was converted and overhauled in the 1970s and which has a maximum power output of 60 MW (limited by pressure tunnels) sources water which inflow from a catchment area of over 80 km2 in the area of the Glarus Alps.
The power stations belonging to Linth-Limmern AG (KLL) in Glarus were built between 1957 and 1968. They use the water inflow from a catchment of around 140 km2 in the headwaters of the River Linth.
Die Kraftwerke Linth-Limmern AG (KLL) haben im Geschäftsjahr 2010/11 einen Jahres-gewinn von 6.316 Mio. CHF erzielt. Die Energieerzeugung fiel mit 403 Mio. kWh leicht geringer aus als im Vorjahr.
An der Generalversammlung von CKW haben die Aktionärinnen und Aktionäre die Jahres- und die Konzernrechnung genehmigt und der beantragten Halbierung der Dividende auf 4.50 CHF je Aktie zugestimmt.
Gewinn deutlich gesunken – Axpo trimmt sich fit und plant über 20 Mrd. CHF Investitionen in die Versorgungssicherheit
January 23, 2012
Der Axpo Konzern muss für das Geschäftsjahr 2010/11 (per 30.9.2011) einen deutlichen Gewinnrückgang ausweisen: Sowohl das Betriebsergebnis (EBIT) von 139 Mio. CHF wie auch das konsolidierte Unternehmensergebnis von 45 Mio. CHF liegen deutlich unter den Vorjahreswerten von 538 Mio. CHF bzw. 409 Mio. CHF.