Kraftwerk Augst AG

Run-of-river power station on the Rhine

The Augst-based power station, which went into operation in 1912, is a plant co-owned between AEW Energie AG and the cantonal authorities of Basel Land. The power station was upgraded to a modern low-pressure run-of-river power station with STRAFLO turbines from 1991 to 1994.

The power station has an output of 34 KW and mean annual production of 205m kWh. Within the scope of the "Culture in the Power Station on the Rhine" project, an historic Francis turbine dating back to 1916 was preserved, along with its inlets and outlets.

Axpo Hydro Energy has been commissioned to manage it since 2001.

ZoomAugst
Facts & figures
Mean annual production:205m kWh
Installed output:34 MW
Turbines:2 Francis turbines
7 Straflo machine groups
Flow rate:750 m3/s

Recent articles

EPD certification of the Wildegg-Brugg run-of-river power plant

April 14, 2010

Das Kraftwerk Wildegg-Brugg präsentiert sich als erstes Laufwasserkraftwerk in der Schweiz mit einer nach ISO 14025 zertifizierten Umweltdeklaration.

more...

Refurbishment of the Linth-Limmern Power Station

September 24, 2009

The power stations belonging to Linth-Limmern AG (KLL) in Glarus were built between 1957 and 1968. They use the water inflow from a catchment of around 140 km2 in the headwaters of the River Linth.

more...

Media news

Letzte Runde der Axpo Super League: Axpo setzt künftig auf Nachwuchs und regionalen Fussball

May 22, 2012

Elf Jahre lang hat das Energieunternehmen Axpo die höchste Schweizer Fussballliga unterstützt, davon neun Jahre als Titelsponsor der Axpo Super League.

more...

Fisetenbach wird im Jahr 2012 an 22 Tagen ausgeleitet

May 21, 2012

Die Fassung am Fisetenbach wird über die Sommermonate in vier Phasen à fünf bzw. sechs Tage vollständig ausser Betrieb genommen.

more...

KKB: Beginn Jahresrevision Block 1

May 15, 2012

Der Block 1 des Kernkraftwerks Beznau (KKB) wird am Freitag, 18. Mai 2012, planmässig für rund sieben Wochen zur Revision mit Brennelementwechsel abgestellt.

more...