Calancasca AG

High-pressure storage power station in the Calanca Valley

Calancasca AG, which is based in Roveredo (GR), is co-owned in equal stakes by Centralschweizerische Kraftwerke AG and Elektrizitäts-Gesellschaft Laufenburg AG.

The facilities at the Calancasca AG power station were built between 1949 and 1951. The 54 m high dam, a gravity dam in the narrow gorge of the Calancasca near Weiler Molina (Buseno local authority), forms the Molina weekly balancing reservoir with a top water level of 686.75 m above sea level and a capacity of 640,000 m3. Water is collected flowing from the unglaciated catchment of the Calancasca below Valbella, over an area of 90 km2, and fed through the pressure tunnel/shaft of the two machine groups in the Sassello underground central station (Roveredo local authority) about 400 m below.

The mean annual production is 87m kWh, with 30m kWh generated in the cold half of the year and 57m kWh generated during the warm half of the year. The machine groups operate at full load (high-pressure run-of-river power station) when the snow melts.

The managerial mandate is held by Axpo Hydro Energy.

Calancasca AG
Facts & figures
Mean annual production:87m kWh
Installed output:20 MW
Turbines:2 twin-nozzle, horizontal-axis Pelton turbines, 10 MW each
Water reservoir:Molina reservoir with a 640,000 m3 usable storage capacity

Recent articles

EPD certification of the Wildegg-Brugg run-of-river power plant

April 14, 2010

Das Kraftwerk Wildegg-Brugg präsentiert sich als erstes Laufwasserkraftwerk in der Schweiz mit einer nach ISO 14025 zertifizierten Umweltdeklaration.

more...

Refurbishment of the Linth-Limmern Power Station

September 24, 2009

The power stations belonging to Linth-Limmern AG (KLL) in Glarus were built between 1957 and 1968. They use the water inflow from a catchment of around 140 km2 in the headwaters of the River Linth.

more...

Media news

Letzte Runde der Axpo Super League: Axpo setzt künftig auf Nachwuchs und regionalen Fussball

May 22, 2012

Elf Jahre lang hat das Energieunternehmen Axpo die höchste Schweizer Fussballliga unterstützt, davon neun Jahre als Titelsponsor der Axpo Super League.

more...

Fisetenbach wird im Jahr 2012 an 22 Tagen ausgeleitet

May 21, 2012

Die Fassung am Fisetenbach wird über die Sommermonate in vier Phasen à fünf bzw. sechs Tage vollständig ausser Betrieb genommen.

more...

KKB: Beginn Jahresrevision Block 1

May 15, 2012

Der Block 1 des Kernkraftwerks Beznau (KKB) wird am Freitag, 18. Mai 2012, planmässig für rund sieben Wochen zur Revision mit Brennelementwechsel abgestellt.

more...