Kraftwerke Ilanz AG

Storage and run-of-river power station in the Anterior Rhine Valley

Ilanz/Glion (GR)-based Kraftwerke Ilanz, which were built from 1984 to 1992, is a plant which is co-owned by the Graubünden cantonal authority, the concession authorities and Axpo AG. The 50m franc share capital is divided as follows: 85% Axpo AG, 10% cantonal authority, 5% concession authorities.

ZoomIlanz

The two independent power station stages, Panix and Tavanasa, use the inflow in the catchment area of the Anterior Rhine, as well as part of the turbined water from Kraftwerke Vorderrhein (Anterior Rhine Power Stations). The Panix reservoir is used primarily for the purposes of daily and weekly compensation. With an output of 87 MW, Kraftwerke Ilanz permit energy to be produced adapted in line with requirements. It produces a mean of around 280m kWh of electricity every year.

Hydro Surselva AG sees to the operational running of the installations. The managerial mandate is held by Axpo Hydro Energy.

Facts & figures
Annual production:280m kWh
Total installed output:87 MW
Panix power station stage
Annual production:130 Mio. kWh
Installed output:52,5 MW
Turbines:1x 52.5 MW Pelton turbine
Water reservoir:Panix reservoir with 7.3m m3 of usable storage capacity
Tavanasa power station stage
Annual production:150m kWh
Installed output:34.5 MW
Turbines:2 Francis turbines, 17.25 MW each
Flow rate:50 m3/s

Recent articles

EPD certification of the Wildegg-Brugg run-of-river power plant

April 14, 2010

Das Kraftwerk Wildegg-Brugg präsentiert sich als erstes Laufwasserkraftwerk in der Schweiz mit einer nach ISO 14025 zertifizierten Umweltdeklaration.

more...

Refurbishment of the Linth-Limmern Power Station

September 24, 2009

The power stations belonging to Linth-Limmern AG (KLL) in Glarus were built between 1957 and 1968. They use the water inflow from a catchment of around 140 km2 in the headwaters of the River Linth.

more...

Media news

Letzte Runde der Axpo Super League: Axpo setzt künftig auf Nachwuchs und regionalen Fussball

May 22, 2012

Elf Jahre lang hat das Energieunternehmen Axpo die höchste Schweizer Fussballliga unterstützt, davon neun Jahre als Titelsponsor der Axpo Super League.

more...

Fisetenbach wird im Jahr 2012 an 22 Tagen ausgeleitet

May 21, 2012

Die Fassung am Fisetenbach wird über die Sommermonate in vier Phasen à fünf bzw. sechs Tage vollständig ausser Betrieb genommen.

more...

KKB: Beginn Jahresrevision Block 1

May 15, 2012

Der Block 1 des Kernkraftwerks Beznau (KKB) wird am Freitag, 18. Mai 2012, planmässig für rund sieben Wochen zur Revision mit Brennelementwechsel abgestellt.

more...