Tecnicama AG

Low-pressure run-of-river power station on the River Moesa

Tecnicama SA, which is based in Roveredo (GR), is owned by Elektrizitäts-Gesellschaft Laufenburg AG.

A hydro power facility was erected in Piani di Verdabbio (municipality of Cama) as far back as 1836 to operate a hammer works. The facility was upgraded to a hydro power station in 1957. It was replaced by a largely automated system in 1987.

Around 500 m above the central station in Piani di Verdabbio, the works water diverted away from the Moesa, fed to the small compensating basin at the central station via the headrace and processed continuously at the central station in Piani di Verdabbio with a maximum fall head of 14 m.

Tecnicama AG

The mean annual production is 1.3m kWh, with 0.4m kWh generated in the cold half of the year and 0.9m kWh generated during the warm half of the year.

The managerial mandate is held by Axpo Hydro Energy.

Facts & figures
Mean annual production: 1.3m kWh
Installed output:0.3 MW
Turbines:1 horizontal-axis, double-flow Francis turbine, 0.3 MW
Water reservoir:Compensating basin with 400 m3 of usable capacity

Recent articles

EPD certification of the Wildegg-Brugg run-of-river power plant

April 14, 2010

Das Kraftwerk Wildegg-Brugg präsentiert sich als erstes Laufwasserkraftwerk in der Schweiz mit einer nach ISO 14025 zertifizierten Umweltdeklaration.

more...

Refurbishment of the Linth-Limmern Power Station

September 24, 2009

The power stations belonging to Linth-Limmern AG (KLL) in Glarus were built between 1957 and 1968. They use the water inflow from a catchment of around 140 km2 in the headwaters of the River Linth.

more...

Media news

Letzte Runde der Axpo Super League: Axpo setzt künftig auf Nachwuchs und regionalen Fussball

May 22, 2012

Elf Jahre lang hat das Energieunternehmen Axpo die höchste Schweizer Fussballliga unterstützt, davon neun Jahre als Titelsponsor der Axpo Super League.

more...

Fisetenbach wird im Jahr 2012 an 22 Tagen ausgeleitet

May 21, 2012

Die Fassung am Fisetenbach wird über die Sommermonate in vier Phasen à fünf bzw. sechs Tage vollständig ausser Betrieb genommen.

more...

KKB: Beginn Jahresrevision Block 1

May 15, 2012

Der Block 1 des Kernkraftwerks Beznau (KKB) wird am Freitag, 18. Mai 2012, planmässig für rund sieben Wochen zur Revision mit Brennelementwechsel abgestellt.