HomepageNavigationPage ContentContactSitemapSearchMain Navigation
kernenergie_thema_en_746x221_neu

Nuclear Energy

Nuclear energy plays a significant role in energy production at Axpo. Safety and reliability are of paramount importance there. The nuclear power stations undergo regular technical upgrades. They have to satisfy the most stringent safety requirements and be operable with long-term cost-efficiency.

Nuclear Energy just under 40 percent of the production capacity installed in Swiss nuclear power stations. Therefore, the electricity generated in the country is free of CO₂ and other atmospheric pollutants.

Axpo AG's fleet of nuclear power stations includes its own facility in Beznau, as well as stakes in co-owned nuclear power stations in Gösgen and Leibstadt, as well as purchase rights to output from French nuclear power stations. Axpo AG has managed the Leibstadt nuclear power station since early 2003.On average, nuclear energy accounts for about two-thirds of the total volume of energy sourced by the Axpo group every year. The nuclear power stations deliver base load energy which is continuously available at constant output. 

Beznau nuclear power station

Beznau nuclear power station

Gösgen nuclear power station (between Olten and Aarau).

Gösgen nuclear power station (between Olten and Aarau).

Leibstadt am Rhein nuclear power station close to the mouth of the River Aare near Koblenz

Leibstadt am Rhein nuclear power station close to the mouth of the River Aare near Koblenz

Switzerland currently has a tried and tested mix of environmentally friendly energy sources, made up of water, sun, wind, biomass and nuclear power. This blend of production technologies has a promising future. In addition, measures to promote energy efficiency and renewables are both important and imperative.
KKW Beznau

Recent articles

Beznau replacement nuclear power plant

March 21, 2011

Applications for general licences suspended

more...

Safety

September 23, 2009

Axpo has formulated a nuclear safety charter to underline the great importance of nuclear safety and of radiation protection. According to this, we agree to take responsibility for measures, thereby maintaining a process of continuous improvement.

more...

Media news

Höherer Jahresgewinn – leicht tiefere Energieerzeugung

January 27, 2012

Die Kraftwerke Linth-Limmern AG (KLL) haben im Geschäftsjahr 2010/11 einen Jahres-gewinn von 6.316 Mio. CHF erzielt. Die Energieerzeugung fiel mit 403 Mio. kWh leicht geringer aus als im Vorjahr.

more...

Generalversammlung CKW

January 27, 2012

An der Generalversammlung von CKW haben die Aktionärinnen und Aktionäre die Jahres- und die Konzernrechnung genehmigt und der beantragten Halbierung der Dividende auf 4.50 CHF je Aktie zugestimmt.

more...

Gewinn deutlich gesunken – Axpo trimmt sich fit und plant über 20 Mrd. CHF Investitionen in die Versorgungssicherheit

January 23, 2012

Der Axpo Konzern muss für das Geschäftsjahr 2010/11 (per 30.9.2011) einen deutlichen Gewinnrückgang ausweisen: Sowohl das Betriebsergebnis (EBIT) von 139 Mio. CHF wie auch das konsolidierte Unternehmensergebnis von 45 Mio. CHF liegen deutlich unter den Vorjahreswerten von 538 Mio. CHF bzw. 409 Mio. CHF.

more...

©  2009 Axpo Holding AG | All Rights Reserved