16.02.2021 | Christoph Sutter, Head Division Renewables at Axpo, on the AlpinSolar project

"2/3 more winter power with alpine solar power plant"

In winter, Switzerland produces significantly less power than it consumes. This lacking power in winter has to be imported. The situation will intensify in the upcoming years when nuclear and coal-fired power plants are taken off grid in Switzerland and abroad. This makes it important to find solutions to produce additional power in the winter from renewable sources. The large-scale, alpine power plant in the Glarus Alps will make a contribution. Christoph Sutter, Head Division Renewables at Axpo, spoke with VSE about the project.

Watch the video interview (German only):

More articles for you

Show all

People

When there is a dam in the middle of the old town

Over 200 starters at the first obstacle course "CityStrongWoMan" in Baden

Read more

Energy market

Why the grid ‘pulse’ is 50 hertz

Consistent grid frequency crucial for grid stability

Read more

Renewable energy

Solar yield at 2500 metres

The challenges of building the largest alpine solar plant

Read more

Renewable energy

Last solar board installed

A milestone at AlpinSolar Muttsee

Read more