08.02.2022 | A gigantic construction: Building a wind power plant

Before the rotor blades start turning

Jeanette Schranz

Author

Email

 

Thirty-five tons of reinforcing iron, over 300 cubic-metres of concrete, tower elements up to 30 metres long: The construction of a wind power plant is a logistical tour de force. Once the various components of the wind power plant are on site, the erection and commissioning of a wind farm only takes 8 to 12 weeks thanks to coordination and precision.

The foundation of a wind power plant is a reinforced iron construction filled with concrete that has to harden for at least 4 weeks. After that everything goes very quickly. Various specialists work hand in hand according to a tight schedule: The tower is placed into the foundation (Fundament), the nacelle that houses the gearbox (die Gondel mit Getriebe), brake (Bremse) and Generator (Generator), and the hub (Nabe) with the rotor blades (Rotorblättern) are mounted on the tower.

Then the interior work begins, which includes the installation of the power cables from the nacelle to the foundation. After successful commissioning including safety tests, the wind power plant under goes a test operation phase. In the test phase the plant must produce during 120 to 240 hours without any intervention from the technicians. The plant must successfully pass this test before final acceptance.

Once the plant is in operation, it generates electricity for some 1650 households.

Axpo subsidiary Volkswind

The Axpo subsidiary Volkswind GmbH has been part of the Axpo Group since the fall of 2015 and has developed more than 80 wind farms in Germany and France with an installed capacity of over 1,350 MW. In France, Axpo is already one of the leading companies in the development and construction of wind energy plants. 

More articles for you

Show all

Renewable energy

A refuge for birds, fish and beavers

The Hydropower Tour de Suisse – Aarekraftwerk Klingnau AG

Read more

Energy market

March saw mix of mild weather and supported fuel markets

European Energy Markets Monthly, April 2024

Read more

People

Reichenau: green hydrogen production ready for take-off

Security of supply? We take care of it – today with Luka Cuderman

Read more

International business

Search for the price bottom continues…

European Energy Markets Monthly, March 2024

Read more