| RO EN

Go to Axpo Group's website

Beznau nuclear power plant: Unit 1 back on grid after scheduled outage

22.05.2020 – The Beznau nuclear power plant (KKB) has completed refurbishment work on Unit 1 and reconnected the reactor to the grid today following the approval of the Swiss Federal Nuclear Safety Inspectorate (ENSI). It was possible to complete the work on schedule despite all the corona-related restrictions and additional efforts. 

The focus of refurbishment comprised maintenance work, recurring tests and inspections. In addition, integral system tests were carried out as usual. Of the 121 fuel assemblies, 20 were replaced with new elements and installed in the reactor core.

As usual during a restart, KKB will also conduct various, additional safety tests on Unit 1 and gradually take up full-load operation. The plant will be back to full load in three days.

During refurbishment the approx. 460 employees at KKB were supported by some 400 external specialists from the region, as well as from Switzerland and abroad. KKB implemented strict measures to prevent the spread of the corona-virus and to protect its own and external staff. Entrance checkpoints, strict adherence to hygiene and distancing rules, health check-ups, quarantine in suspected cases, split operation and home office proved to be effective. No corona-virus infections occurred.

At times, visible steam will be emitted from the non-nuclear section of the plant during the restart. This does not pose any danger to human beings or the environment.

All work was supervised by the Federal Nuclear Safety Inspectorate ENSI.

Axpo Holding AG

Corporate Communications

[email protected]

T 0800 44 11 00 (Schweiz) 
T +41 56 200 41 10 (International)

(08.00 - 17.30)

More media releases

Show all

International business 26.05.2026

Axpo and Carnival Corporation conduct Naples’ first LNG refuelling of a cruise ship

Axpo has successfully completed the first LNG bunkering of a cruise ship in Naples, Italy, it was announced today. Ship-to-ship refuelling of the Sun Princess, operated by Princess Cruises, part of Carnival Corporation – the world’s largest cruise operator – took place on 24 May. The operation is a significant milestone in the development of infrastructure and services for alternative marine fuels in Italy, supporting the transition to lower emission fuels.

Read more

Solar energy 08.05.2026

Axpo inaugurated 200 MWp solar complex in Spain

The Vilecha solar complex in north-western Spain was officially opened by Axpo on 7 May 2026. The large-scale facility comprises four major photovoltaic plants with a combined capacity of 200 megawatts peak (MWp). The largest solar complex in the Axpo Group, Vilecha covers 310 hectares and began feeding renewable electricity into the Spanish grid in February 2026.

Read more

International business 05.05.2026

Axpo and R.Power sign the largest optimisation BESS deal in Central and Eastern Europe

Axpo and R.Power have signed another multi-year contract to optimise operation of a large-scale battery energy storage system (BESS) in Poland. The new 300 MW/1,200 MWh facility will be constructed in Dzięgielewo, Mazovia province, increasing the flexibility of Poland’s power system. The long-term agreement between the companies currently represents the largest deal of its kind for a single project in Central and Eastern Europe, and one of the largest in Europe.

Read more