10.06.2020 | A very special assignment for Axpo linesmen

Special stork rescue operation

Not exactly everyday work for Axpo linesmen: Storks built a nest dangerously near an insulator on an SBB power pylon near Schwerzenbach. To protect the recently hatched fledglings and their parents from a possible electric shock, SBB and Axpo, in close cooperation with experts from "Storch Schweiz" and the Department of Hunting & Fishing of the Canton of Zurich organised a stork rescue operation and moved them to safer location in the middle of the pylon. 

Two lifting cranes, linesmen and stork experts – what a contingent to move the stork family in Schwerzenbach (ZH). In a three-hour rescue operation, a new home was created for the storks at a height of 20 metres.

More articles for you

Show all

Energy market

Price swings amid volatile weather, market speculation, and geopolitical risks

European Energy Markets Monthly, October 2024

Read more

Renewable energy

Green Deal Team: Keeping the EU on track for climate neutrality in 2050?

EU energy & climate policy: 2024 - 2029

Read more

Energy market

No room for experimenting with the WACC

Notwendigen Netzausbau nicht gefährden

Read more

People

Expert insights on Energy’s next decade

Axpo Netherlands: the first 10 years

Read more