11.02.2020 | Renovation of Isola dam

Cutting through the wall

As a preventive measure, Axpo is renovating the Isola dam of Misoxer Kraftwerke in the Grison Alps. A 16-millimetre-wide concrete section weighing about 10 tonnes will be cut out of the wall. In this film, the Axpo expert explains how this is carried out and why the measure was necessary. 

More articles for you

Show all

Commitment

Security of supply: the Axpo top ten

Over a hundred years of reliability: the key role of Axpo in Switzerland’s power supply

Read more

Axpo Italy powers ambitious e-scooter sharing service

Need a ride? Rent one!

Read more

Energy market

Supply security: a combination of production, trade and market

Switzerland’s current energy supply has grown historically. The system has been continuously adapted and improved due to technological and social changes. The interaction between trade and production is of fundamental importance. An analysis by Polynomics has come to the conclusion that trading increases not only efficiency, but ultimately also supply security.

Read more

Innovation

For more security of supply: Hydropower goes digital

Tour de Suisse of Hydropower, part 4

Read more