| RO EN

Go to Axpo Group's website

11.02.2020 | Renovation of Isola dam

Cutting through the wall

As a preventive measure, Axpo is renovating the Isola dam of Misoxer Kraftwerke in the Grison Alps. A 16-millimetre-wide concrete section weighing about 10 tonnes will be cut out of the wall. In this film, the Axpo expert explains how this is carried out and why the measure was necessary. 

More articles for you

Show all

Renewable energy

Large battery storage systems: a key pillar of the energy transition

Intelligent technology for a stable power grid

Read more

Sustainability

Biodegradable tableware instead of mountains of waste

Axpo Biomasse offers a practical and sustainable waste disposal solution for event organisers

Read more

People

When data shows where equality is stalling

The energy sector is struggling with an old problem: too few women in leadership positions. But how much change is needed to achieve true equality? Axpo is looking for the answer in data models rather than gut feelings. The result: a simulation shows where targeted measures really work – and where good intentions come to nothing.

Read more