Beznau nuclear power plant: Start of refueling in Unit 2

4.8.2020 - Unit 2 of the Beznau nuclear power plant (KKB) was taken off grid today, Tuesday, as planned in order to carry out refuelling. After reactor reloading, the plant will be ready for the next operating cycle.

The shutdown of Unit 2 marks the end of the production cycle that began on 20 September 2019. Since then, KKB 2 reliably produced about 2.9 billion kilowatt hours of electricity without interruption. This correspondsto the annual power consumption of about 600,000 households in Switzerland.

During the shutdown that will last about two weeks, 20 of the 121 fuel elements will be replaced and installedin the reactor core. In addition, recurring inspection work and integral system tests will be performed.

During the shutdown, steam from the non-nuclear section will be visible above the powerhouse. This does not pose any danger to human beings or the environment.

During refuelling, the approx. 460 KKB employees will be supported by some 120 external experts.

The measures instituted in spring to prevent the spread of the corona-virus and to protect internal and external staff will continue to be closely observed.

Refuelling work is supervised by the Federal Nuclear Safety Inspectorate ENSI.

 

Additional information

Axpo Holding AG, Corporate Communications 

T 0800 44 11 00 (Switzerland) | T +41 56 200 41 10 (international), medien@axpo.com

Axpo Holding AG

Corporate Communications

medien@axpo.com

T 0800 44 11 00 (Schweiz) 
T +41 56 200 41 10 (International)

(08.00 - 17.30)

More media releases

Show all

International business 02.05.2024

Axpo and Ineos Oxide sign corporate PPA in Belgium

Axpo and Ineos Oxide, a leading chemicals manufacturer in Belgium, have signed a corporate power purchase agreement (PPA), it was announced today. The long-term deal covers 12 megawatts of renewable energy, making an important contribution to the green transition in the Antwerp port area.

Daha fazla oku

Solar energy 30.04.2024

Axpo and Disneyland Paris commission Europe’s largest solar parking canopy

Following more than three years’ construction, Disneyland Paris and Axpo have equipped 11,200 parking spaces at the leading entertainment resort with solar panels, it was announced today. The solar parking canopy, currently the largest of its kind in Europe, will generate 36 GWh of green electricity a year. The project is of strategic significance for Axpo in its development of renewable energies.

Daha fazla oku

Renewable energy 26.04.2024

Axpo and Rhiienergie open largest green hydrogen production plant in Switzerland

Axpo and electric utility Rhiienergie opened the first green hydrogen production plant in Switzerland’s Graubünden canton, it was announced today. The facility, the country’s largest, is located next to the Reichenau hydropower plant in Domat/Ems and can produce up to 350 tonnes of green hydrogen a year. The inclusion of hydrogen in the energy mix will play an increasingly important role in ensuring the future security of supply.

Daha fazla oku