| ES EN

Go to Axpo Group's website

Beznau nuclear power plant: Start of refueling in Unit 2

4.8.2020 - Unit 2 of the Beznau nuclear power plant (KKB) was taken off grid today, Tuesday, as planned in order to carry out refuelling. After reactor reloading, the plant will be ready for the next operating cycle.

The shutdown of Unit 2 marks the end of the production cycle that began on 20 September 2019. Since then, KKB 2 reliably produced about 2.9 billion kilowatt hours of electricity without interruption. This correspondsto the annual power consumption of about 600,000 households in Switzerland.

During the shutdown that will last about two weeks, 20 of the 121 fuel elements will be replaced and installedin the reactor core. In addition, recurring inspection work and integral system tests will be performed.

During the shutdown, steam from the non-nuclear section will be visible above the powerhouse. This does not pose any danger to human beings or the environment.

During refuelling, the approx. 460 KKB employees will be supported by some 120 external experts.

The measures instituted in spring to prevent the spread of the corona-virus and to protect internal and external staff will continue to be closely observed.

Refuelling work is supervised by the Federal Nuclear Safety Inspectorate ENSI.

 

Additional information

Axpo Holding AG, Corporate Communications 

T 0800 44 11 00 (Switzerland) | T +41 56 200 41 10 (international), medien@axpo.com

Axpo Holding AG

Corporate Communications

[email protected]

T 0800 44 11 00 (Schweiz) 
T +41 56 200 41 10 (International)

(08.00 - 17.30)

More media releases

Show all

Nuclear energy 24.06.2026

Beznau Nuclear Power Plant responds to high Aare water temperatures

Axpo has reduced the output of both units of the Beznau NPP due to the current heatwave and will temporarily shut them down if the heat persists. This measure serves to protect the Aare ecosystem and to ensure compliance with all environmental legal requirements. 

Read more

International business 23.06.2026

Axpo and e-STORAGE agree their first joint battery project in Italy

Axpo and Canadian Solar Inc. subsidiary e-STORAGE have agreed to develop an 8 MW/40 MWh battery energy storage system (BESS) in southern Italy, it was announced today. Construction at Axpo’s Rizziconi power plant in Calabria is due to begin end of 2026, with deliveries of electricity to the grid expected early 2028.

Read more

International business 22.06.2026

Axpo conducts its first bio-LNG refuelling of MOL vessel in Barcelona

Axpo’s refuelling of a Mitsui OSK Lines (MOL) vessel was its first ship-to-ship bio liquefied natural gas (LNG) bunkering operation in the port of Barcelona, it was announced today. MOL’s Lapis Ace vehicle carrier received bio-LNG from Axpo's bunkering vessel Green Pearl, marking another milestone in the development of alternative marine fuels infrastructure and services in Spain.

Read more