The grid usage tariffs for off-take from grid level 3 (50 kV - 110 kV) and grid level 5 (11 kV - 16 kV) as well as the metering tariff of Axpo Grid AG are listed below.
The annual total of grid usage fees corresponds to the item “Umsatzerlöse aus Netznutzung” in the annual financial statements in the regulatory annual financial statements below.
The technical connection conditions for high- and medium-voltage systems (German only) can be found under Power Supply.