| DE EN

Beznau nuclear power plant: Unit 1 back on grid after scheduled outage

22.05.2020 – The Beznau nuclear power plant (KKB) has completed refurbishment work on Unit 1 and reconnected the reactor to the grid today following the approval of the Swiss Federal Nuclear Safety Inspectorate (ENSI). It was possible to complete the work on schedule despite all the corona-related restrictions and additional efforts. 

The focus of refurbishment comprised maintenance work, recurring tests and inspections. In addition, integral system tests were carried out as usual. Of the 121 fuel assemblies, 20 were replaced with new elements and installed in the reactor core.

As usual during a restart, KKB will also conduct various, additional safety tests on Unit 1 and gradually take up full-load operation. The plant will be back to full load in three days.

During refurbishment the approx. 460 employees at KKB were supported by some 400 external specialists from the region, as well as from Switzerland and abroad. KKB implemented strict measures to prevent the spread of the corona-virus and to protect its own and external staff. Entrance checkpoints, strict adherence to hygiene and distancing rules, health check-ups, quarantine in suspected cases, split operation and home office proved to be effective. No corona-virus infections occurred.

At times, visible steam will be emitted from the non-nuclear section of the plant during the restart. This does not pose any danger to human beings or the environment.

All work was supervised by the Federal Nuclear Safety Inspectorate ENSI.

Axpo Holding AG

Corporate Communications

[email protected]

T 0800 44 11 00 (Schweiz) 
T +41 56 200 41 10 (International)

(08.00 - 17.30)

More media releases

Show all

Wind power 08.06.2026

Axpo launches Lalax wind farm in Finland

Axpo today inaugurated its first wind farm in Finland. Located in the municipality of Vörå, the Lålax facility was officially opened at a ribbon-cutting ceremony in the presence of Finland’s Minister for European Affairs, Joakim Strand.

Read more

International business 03.06.2026

Axpo launches power balancing services in Hungary

Axpo has launched its electricity balancing services business in Hungary (locally known as aggregator) following accreditation of its portfolio of photovoltaic (PV) assets by the national grid, it was announced today. The move is the latest milestone in the company's expansion across Central European renewable energy markets.

Read more

Solar energy 02.06.2026

Axpo feeds solar energy into the German grid for the first time

Axpo is pressing ahead with its expansion in the German renewable energy market: the ground-mounted solar power plants in Borgdorf-Seedorf (30 MWp) and Eisendorf (15 MWp) have been operational since May. With these projects, the Swiss energy company is demonstrating its expertise in the expansion of renewable energy and supporting the energy transition in Germany.

Read more