Switch to the Axpo Group website.

Go to Axpo Group website.

Beznau nuclear power plant: emergency shutdown in unit 2

10.02.2025 - An unintentional emergency shutdown of unit 2 of the Beznau nuclear power plant was triggered during a routine check. The plant was in a safe state at all times. It will be reconnected to the grid after consultation with ENSI.

Due to an operating error, a scram of the reactor in unit 2 of the Beznau nuclear power plant (KKB) occurred today at 1:05 p.m. during a routine check. The plant responded as designed and was in a safe state at all times. The supervisory authority ENSI and other authorities were informed as required by regulations.

KKB is reconnecting the plant to the grid in agreement with ENSI.

During the restart, water vapour is visible above the plant's turbine hall (non-nuclear part). There is no danger to the population or the environment.

Axpo Holding AG

Corporate Communications

medien@axpo.com

T 0800 44 11 00 (Schweiz) 
T +41 56 200 41 10 (International)

(08.00 - 17.30)

More media releases

Show all

Hydropower 18.06.2025

Axpo opens Switzerland’s highest and longest photo gallery

Read more

Company 16.06.2025

CKW Fiber Services AG becomes part of Axpo Systems AG

Read more

Company 27.05.2025

Axpo achieves good half-year results in uncertain environment

Read more