Nuclear energy
28.08.2026
Beznau nuclear power plant: Both units back on grid
Axpo reconnected Unit 2 of the Beznau Nuclear Power Plant (KKB) to the grid following the completion of the refuelling outage. Unit 2 is now gradually returning to power operation and is expected to reach full capacity within approximately two days. Unit 1 has been back in operation since 21 August 2026, following the cooling of the River Aare.
Read more